華新能源電纜系統股份有限公司
Joint Development Engineer
10/9 Updated
Array
Full-time
Manager/Director
English Required
0 ~ 5 applicants

Salary & Location

Salary negotiable
(Regular monthly salary of NT$40,000 or above)
高雄市小港區

Required

Language Requirements
English
聽/中等、說/中等、讀/中等、寫/中等
Work Experience
5年以上

Job Description

The joint development engineer is responsible to determine factory joint parameters for all projects. The joint development engineer is also responsible for the managing of the factory jointers including planning of training.
Above responsibilities include the following details.
• Disciplinary responsible for FJ jointers.
• Create Inspection and Test Plan (ITP) for FJ testing.
• Determine factory joint parameters (temperatures and durations).
• Optimize the process to determine factory joint parameters, e.g., by performing of thermal simulations.
• Responsible for maintenance of jointing tools.
• Internal or external ordering of semi-con and insulating XLPE tapes.
• Planning of work plans for jointers taking demands from projects into account.
• Coordinate the jointing for projects with production team on a regular basis.
• Coordinate external party for x-ray inspections on joints.
• Cooperate with quality department on quality related matters.
• Ensure safe working environment during jointing and jointing training.
• When no jointing for projects is required, organize the training for the jointers including testing of samples.
• Coordinate sample testing with R&D Test Laboratory Manager.
Number of Openings
1~1人
Educational Requirements
大學(學院)以上
Field of Study Requirements
化學工程相關、電機電子工程相關、機械工程相關
Work Schedule
日班
Leave Policy
依公司規定
Job Category
Mechanical Engineers
Electro-Mechanical Technician/Engineer
Electrical Engineers
電線電纜與不銹鋼產業領導龍頭華新麗華,與來自丹麥世界三大電纜廠之一的NKT集團旗下NKT HV Cables AB合作,共同打造全台首座的海底電纜廠,為台灣提供一流品質與合理價格的產品。 承接華新麗華在電纜事業超過50年歷史的基礎,華纜系統將致力創建具有市場領先技術的離岸電纜企業,並秉持台灣政府實現綠色能源永續發展的願景,期待成為台灣離岸風電行業發展的重要實現者。 Taiwan's first offshore cable system provider! A joint venture between Walsin Lihwa and NKT, merging best practices between two global cable companies in pioneering green energy transmission.
0 ~ 5 applicants